The Unified Port of San Diego decided to revitalize an existing Roof / Podium to create a usable terrace and events space.
- The project included demolition and hauling away 10,000 square feet of concrete and 24,000 Sq. ft. of built up asphalt roofing.
- Once the surface was prepared, installation of sheet metal flashings and the Westcoat waterproofing system was applied.
- The project also included many other details such as custom roof vents, drain installations, railing attachments and planters, to finish off what turned out to be a beautiful terrace for the Unified Port employees.